Construction | Technology
Electrical | Mechanical
T: +353 1 840 2116
F: +353 1 890 0376
Your Name (required)
Your Email (required)
Your contact number(required)
Division to contact
Electrical
Subject
Your Message
Please enter the characters as displayed
To use CAPTCHA, you need Really Simple CAPTCHA plugin installed.
Nexus Boiler Installation – UCD
Download project details Download PDF

Nexus UCD, located in the Belfield Office Park, offers prestigious accommodation and services for companies in close proximity to UCD’s world-class research base.  The existing heating system in the building was served by a 15 year old, obsolete modular boiler system which was providing about 60% of the required 300kW heating output.

Nexus UCD approached McKeon Group to propose a solution to their present heating needs; to provide certainty and flexibility to suit the current needs of the building and to facilitate possible future modifications.  McKeon Group selected a three boiler De Deitrich cascade system with full on board, stand alone controls integrated with the existing heating distribution pipework and control monitoring back to the main UCD campus BMS.

The project was completed and commissioned the boiler installation on budget and within the agreed programme.  The installation has allowed Nexus UCD to assure their clients and tenants that the heating services provided within their work space meets the latest efficiency and performance levels available in the industry.   

Project Details
Share this